3 alerts
See all
  • Power outage: Harbor Street area and 1 more. About 498 customers out. Restore times and the outage line
  • Notice: Harbor Street water main work: one lane closed weekdays between 1st and 6th Streets. Details
  • Warning: Thanksgiving: City Hall closed Thursday and Friday. Thursday trash routes move to Friday. Details

Documents

ITB 2026-07 Harbor Street sidewalk repairs: specifications

· Web page version of the PDF

This is the text of the document, page by page, so it is easy to read on any screen or with a screen reader. Tables and pictures are only in the original.

Download an accessible PDF of this text (tagged for screen readers)

Download the original (PDF, 3 KB)

Page 1

City of Bayport, Florida ITB 2026-07 Harbor Street sidewalk repairs:

specifications Scope Remove and replace about 2,400 square feet of damaged sidewalk on Harbor Street between 1st and 6th Streets, with ADA curb ramps at four corners. Schedule Work must be finished within 60 days of notice to proceed, outside the hours of 7 p.m. to 7 a.m.

Requirements Bidders must hold a Florida certified or registered general contractor license and carry the insurance listed in section 7.

Need it in another format? Contact the City Clerk at (850) 555-0100.